Nudo de la tercera ronda en Pocomaco
The works carried out at the junction of the third ring road on the section of the third ring road from CP-3002 to Pocomaco,…
The works carried out at the junction of the third ring road on the section of the third ring road from CP-3002 to Pocomaco,…
General inspection of the 16 footbridges in the city of A Coruña, data collection and analysis of their current situation, diagnosis of the structural…
We have designed numerous singular structures, false tunnels, viaducts and special foundations on the Atlantic Axis High-Speed Rail Line. We have also conducted research…
CIMARQ carried out the following works, in collaboration with the Port Authority of A Coruña: Special inspection of the structures. Both underwater and aerial…
CIMARQ carried out Technical Assistance during the works and the drafting of the final execution project. Hydrological, hydraulic, structural and geotechnical studies were carried…
CIMARQ carried out Technical Assistance during the works and the drafting of the final execution project. Hydrological, hydraulic, structural and geotechnical studies were carried…
Clients: UTE Arias Hermanos – Isolux // Construcciones López Cao, SL Owners: Ferroatlántica Reach: Construction project (Ponteolveira II, Castrelo, Fervenza II) Technical assistance, manoeuvre design…
CIMARQ, in close collaboration with MSPFA, carried out the conveyor belts and transfer towers project. Client: Martínez Segovia, Fernández, Pallas y Asociados Ingeniería y…
The scope of our work on the MURO DE ALCOY-PUERTO DE ALBAIDA section of the Autovía del Mediterráneo (A-7 Motorway) is: analysis and extension…
The works on the submerged overflow channel consist of building a wall to divide the overflow channel into two channels, with two floodgates, as…