Civil, H2O, Repair

Dam in Barcena

The works on the submerged overflow channel consist of building a wall to divide the overflow channel into two channels, with two floodgates, as well as other installations. CIMARQ carried out the following works: 1. Design of the test campaign to determine the state of the concrete in the body of the dam. 2. Hydraulic and structural modelling to determine the optimum hydraulic geometry, actions and stresses in the different elements. 3. In collaboration with the stakeholders, define the best solution for the execution. 4. Technical assistance during the works

Client: COPASA

Owner: Confederación Hidrográfica del Miño-Sil

Gallery

Share:
Social