3 POWER PLANTS IN XALLAS
Clients: UTE Arias Hermanos – Isolux // Construcciones López Cao, SL Owners: Ferroatlántica Reach: Construction project (Ponteolveira II, Castrelo, Fervenza II) Technical assistance, manoeuvre design…
Clients: UTE Arias Hermanos – Isolux // Construcciones López Cao, SL Owners: Ferroatlántica Reach: Construction project (Ponteolveira II, Castrelo, Fervenza II) Technical assistance, manoeuvre design…
CIMARQ has developed, in close collaboration with the engineers from CONFEDERACIÓN HIDROGRÁFICA DEL MIÑO-SIL, the analysis and development works of the construction project, as…
CIMARQ carried out Technical Assistance during the works and the drafting of the final execution project. Hydrological, hydraulic, structural and geotechnical studies were carried…
CIMARQ carried out Technical Assistance during the works and the drafting of the final execution project. Hydrological, hydraulic, structural and geotechnical studies were carried…
CIMARQ carried out the following works, in collaboration with the Port Authority of A Coruña: Special inspection of the structures. Both underwater and aerial…
The works on the submerged overflow channel consist of building a wall to divide the overflow channel into two channels, with two floodgates, as…
CIMARQ has carried out Technical Assistance during the works, providing all our experience in the execution and placement of blocks of up to 180…
CIMARQ developed the construction project for the civil works of the WWTP in close collaboration with the different stakeholders. In 2019, the project received…