3 POWER PLANTS IN XALLAS
Clients: UTE Arias Hermanos – Isolux // Construcciones López Cao, SL Owners: Ferroatlántica Reach: Construction project (Ponteolveira II, Castrelo, Fervenza II) Technical assistance, manoeuvre design…
Clients: UTE Arias Hermanos – Isolux // Construcciones López Cao, SL Owners: Ferroatlántica Reach: Construction project (Ponteolveira II, Castrelo, Fervenza II) Technical assistance, manoeuvre design…
CIMARQ has developed, in close collaboration with the engineers from CONFEDERACIÓN HIDROGRÁFICA DEL MIÑO-SIL, the analysis and development works of the construction project, as…
CIMARQ carried out Technical Assistance during the works and the drafting of the final execution project. Hydrological, hydraulic, structural and geotechnical studies were carried…
CIMARQ carried out Technical Assistance during the works and the drafting of the final execution project. Hydrological, hydraulic, structural and geotechnical studies were carried…
We have designed numerous singular structures, false tunnels, viaducts and special foundations on the Atlantic Axis High-Speed Rail Line. We have also conducted research…
The works carried out at the junction of the third ring road on the section of the third ring road from CP-3002 to Pocomaco,…
This bridge, crossing of the State Road Network, is included in the existing heritage in which the Spanish Ministry of Public Works carries out…
The works carried out by CIMARQ at the Aït Baha cement factory in Morocco were: project of structures for warehouses, hopper building and bagging…
The scope of our work on the MURO DE ALCOY-PUERTO DE ALBAIDA section of the Autovía del Mediterráneo (A-7 Motorway) is: analysis and extension…
The works on the submerged overflow channel consist of building a wall to divide the overflow channel into two channels, with two floodgates, as…